News

29/01/2016

n.4 post-combustion plants – Turin

FAR energia supplied and installed 4 plants of regenerative thermal oxidizer of the exhaust gases of four engines (GEJenbacher JGS 420) on biogas from anaerobic digestion.

IMG-20160126-WA0002

IMG-20160126-WA0001