Energy consulting

FAR energia provides its customers with energy consulting service with the goal of identifying possible areas in where efficiency measures can be applied that will lead to significant savings in energy consumption.

Plants design and construction

FAR energy has designed and built cogeneration plants fueled by natural gas, landfill gas, biogas from sewage treatment plant or biodigester with power ratings from 100 kW up to 9 MW.

Energy trading

FAR energia, a leader in the field of cogeneration, has 12 years of experience with more than 100 plants installed for a total of over 100 MW.

News

03/02/2020

Cogeneration Plant – Busseto (PR)

FAR energia has designed, supplied and installed a new cogeneration plant fueled by natural gas. Electric power of 851 kW, thermal power of 460 kW as 10 bar(g) steam and 504 kW as hot water. (GE Jenbacher JMS316 engine).

20/12/2019

Trigeneration plant – Orbassano (TO)

A new trigeneration plant fueled by natural gas has been supplied and installed by FAR Energia. Electric power of 635 kW and cool capacity of 570 kWf as refrigerated water. Jenbacher JGS 312 engine.  

All News

Company members: